Headrace Tunnel for Dabar Hydro Power Plant

Location icon Trebinje, Bosnia ed Erzegovina, Bosnia and Herzegovina
Traditional excavation for the 12km tunnel.
Mapei supplied the shotcrete accelerator MAPEQUICK AF 1000 IL.
Ref #: 0
Category:

Construction