Headrace Tunnel for Dabar Hydro Power Plant
Trebinje, Bosnia ed Erzegovina, Bosnia and Herzegovina
Traditional excavation for the 12km tunnel.
Mapei supplied the shotcrete accelerator MAPEQUICK AF 1000 IL.
Construction
|
|
| Location |
Trebinje, Bosnia ed Erzegovina, Bosnia and Herzegovina
|
| Subcategory |
|
| Built in |
2018
|
| Application Type |
|
| Client |
Bosnia and Herzegovina Government
|
| Contractor company |
Integral
|