Herrschaftsbucktunnel

Location icon Rheinfelden, Germany
Highway A98 between highway triangle Hochrhein and the junction Minseln near the city of Rheinfelden. 2 tubes with a length of 450 m. Drill and blast excavation method with shotcrete application. shotcrete accelerator used: MAPEQUICK 043 FFG SBE/2.
Ref #: 0
Category:

Construction

Location Rheinfelden, Germany
Subcategory
Application Highway A98 between highway triangle Hochrhein and the junction Minseln near the city of Rheinfelden. 2 tubes with a length of 450 m. Drill and blast excavation method with shotcrete application. shotcrete accelerator used: MAPEQUICK 043 FFG SBE/2.
Start and finish date 2018
Application Type
Client Regierungspräsidium Freiburg (BW)
Contractor company ARGE Herrschaftsbucktunnel, BeMo Tunnelling GmbH, Subterra a.s.