Toggle navigation
About & Services
Products
Projects
Downloads
News
Contact us
Back
High-speed railway project Genoa-Milan- tunnel 'Pozzo Cascina Radimero' at Arquata Scrivia
Arquata Scrivia, Italy
one EPB Herrenknecht, is currently excavating the first sector of 1800m and with a diameter of 9.77m
Ref #:
0
Category:
Construction
Location
Arquata Scrivia, Italy
Subcategory
Built in
2016
Application Type
Contractor company
COCIV (J.V. Salini-Impregilo, Condotte)
Browse the
project Gallery
Product used
for the project
MAPEBENT CBS4
Sodic bentonite for civil engineering
Sodic bentonite for civil engineering
MAPEQUICK CBS SYSTEM 1 L
MAPEQUICK CBS SYSTEM 3
Accelerator for cement-based grouts
Accelerator for cement-based grouts
POLYFOAMER ECO 100
Product not available for this market,
contact us
Product not available for this market,
contact us