The Highway S.S 125 constituites the new highway that connects North and South Sardegna, Italy. Three tunnel of around 9 km (64 km totl of Highway) have been excavated by Drill and Blast method.
Synthetic waterproofing membrane Where to use • Drill and blast tunnel waterproofing. • Open cut tunnel waterproofing. • Underground structures waterproofing. Packaging Mapeplan TU is supplied in 20…
Synthetic waterproofing membrane Where to use • Drill and blast tunnel…