With a total investment of VND7 trillion (US$329 million) dong, the Huana Hydropower Plant with a designed capacity of 180 MW and two generators has been completed on the scheduled, bringing huge economic benefits. Moreover, the plant will supply on average 3.2 million kWh/day to the national grid . information: headrace tunnel length: 4000m and 6.2m diameter excavated by New Austria Tunneling Method (NATM).
Alkali-free accelerator for shotcrete Where to use • Securing surfaces during tunnelling. • Inner lining even in presence of very squeezing soils. • Shotcrete for structural tunnel repairs. •…
Alkali-free accelerator for shotcrete Where to use • Securing surfaces during…