Koralmtunnel – KAT 3

Location icon Carinthia, Austria, Austria
The KAT3 construction stage consists of two tunnels which are being driven using different construction methods and extend from the Carinthian side of the construction from 73km + 772 to km 63 + 200.Geologically, the KAT3 Koralm tunnel is divided up into different zones:
•Neogene sediments (alternating clay/silt/sand/gravel)
•The main Lavanttal fault
•Crystalline (fine grain gneiss, mica schist, marble)
Ref #: 0
Category:

Construction

Location Carinthia, Austria, Austria
Subcategory
Built in 2009
Opened in 2012
Application Type
Contractor company J.V. (led by Porr)

Product used for the project

ADESILEX PG4
ADESILEX PG4
Two-component, thixotropic epoxy adhesive with modified rheology for bonding…
MAPEBLOX/T L
MAPEBLOX/T L
Tail seal grease for mechanized tunneling with TBM
MAPEFIX VE SF
MAPEFIX VE SF
Styrene-free, hybrid vinyl resin-based chemical anchor for structural loads.…
POLYFOAMER FP
POLYFOAMER FP
High performance liquid foaming agent, based on biodegradable anionic…
SILICAJET EXP/E
SILICAJET EXP/E
Organic-mineral based two-component resin for injections, with high reaction…
SILICAJET EXP/E
SILICAJET EXP/E
Organic-mineral based two-component resin for injections, with high reaction…