Koralmtunnel – KAT 3
Carinthia, Austria, Austria
The KAT3 construction stage consists of two tunnels which are being driven using different construction methods and extend from the Carinthian side of the construction from 73km + 772 to km 63 + 200.Geologically, the KAT3 Koralm tunnel is divided up into different zones:
•Neogene sediments (alternating clay/silt/sand/gravel)
•The main Lavanttal fault
•Crystalline (fine grain gneiss, mica schist, marble)
Construction
|
|
Location |
Carinthia, Austria, Austria
|
Subcategory |
|
Built in |
2009
|
Opened in |
2012
|
Application Type |
|
Contractor company |
J.V. (led by Porr)
|