Kulch and Lichtenholz Tunnels

Location icon Ebensfeld, Deutschland, Germany
A double track railway tunnel (1 tube each) was excavted by traditional drill and blast method. The Kulch tunnel of 1,331 m and the Tunnel Lichtenholz with 931 m went trough clay, marl, limestone alternationa nd sandstone respectively.
shotcrete accelerator supplied: MAPEQUICK 043 FFG (SBE)
Ref #: 0
Category:

Construction

Location Ebensfeld, Deutschland, Germany
Subcategory
Built in 2010
Opened in 2012
Application Type
Client ARGE Lichtenfels (HOCHTIEF, Alpine)
Contractor company DB ProjekBau HmbH Regionalbereich Sudost