Kulch and Lichtenholz Tunnels
Ebensfeld, Deutschland, Germany
A double track railway tunnel (1 tube each) was excavted by traditional drill and blast method. The Kulch tunnel of 1,331 m and the Tunnel Lichtenholz with 931 m went trough clay, marl, limestone alternationa nd sandstone respectively.
shotcrete accelerator supplied: MAPEQUICK 043 FFG (SBE)
Construction
|
|
| Location |
Ebensfeld, Deutschland, Germany
|
| Subcategory |
|
| Built in |
2010
|
| Opened in |
2012
|
| Application Type |
|
| Client |
ARGE Lichtenfels (HOCHTIEF, Alpine)
|
| Contractor company |
DB ProjekBau HmbH Regionalbereich Sudost
|