Kulch and Lichtenholz Tunnels
Ebensfeld, Deutschland, Germany
A double track railway tunnel (1 tube each) was excavted by traditional drill and blast method. The Kulch tunnel of 1,331 m and the Tunnel Lichtenholz with 931 m went trough clay, marl, limestone alternationa nd sandstone respectively.
shotcrete accelerator supplied: MAPEQUICK 043 FFG (SBE)
Construction
|
|
Location |
Ebensfeld, Deutschland, Germany
|
Subcategory |
|
Built in |
2010
|
Opened in |
2012
|
Application Type |
|
Client |
ARGE Lichtenfels (HOCHTIEF, Alpine)
|
Contractor company |
DB ProjekBau HmbH Regionalbereich Sudost
|