LTA Downtown Line Stage 1- Contract 902

Location icon Singapore, Singapore
The 6.35 m diameter tunnel was excavated with an EPB-TBM (SHANGHAI) type.
Ref #: 0
Category:

Construction

Location Singapore, Singapore
Subcategory
Built in 2010
Opened in 2011
Application Type
Client Land Transport Authority
Contractor company STEC (China)

Product used for the project

MAPEBLOX T
MAPEBLOX T
MAPEBLOX T
POLYFOAMER FP
POLYFOAMER FP
High performance liquid foaming agent, based on biodegradable anionic…
2226 - MAPEBLOX PKG
MAPEBLOX PKG
Product not available for this market,
contact us
2249 - MAPEDRILL BIO L
MAPEDRILL BIO L
Product not available for this market,
contact us
2275 - MAPEQUICK CBS SYSTEM 2
MAPEQUICK CBS SYSTEM 2
Product not available for this market,
contact us