LTA Line Circle Stage V Contract 855, Singapore
Singapore, Singapore
Contract 855 is for construction of 4 km of twin bored tunnels, 350 m of cut-and-cover tunnels, civil works for three underground stations, and architectural and building services for another four stations.
The tunnels were excavated with four Herrenknecht (2*EPB+2 Slurry). Tunnel were lined with concrete segments 5.8 m internal diameter.
Construction
|
|
Location |
Singapore, Singapore
|
Subcategory |
|
Built in |
2005
|
Opened in |
2009
|
Application Type |
|
Client |
Land Transport Authority
|
Contractor company |
Alpine Mayreder, Who Hup Constructor. Comp., Shanghai Tunnelling
|