The tunnel is made up of two tubes with a length of 470m. The tunnelallows the TEEM, the external bypass in the south-east area of Milan to pass under the Metro line 2 in Gessate at a depth of about 13m. products supplied by Mapei UTT: CABLEJET, VISCOFLUID JET, MAPEPLAST UW, MAPEPLAST SF