Metro 4 line Bucharest

Location icon Bucarest, Romania, Romania
the Underground Length is 2 km approx. the excavation was done with TBM type: 1 x EPB NFM diameter:6.45m
Ref #: 0
Category:

Construction

Location Bucarest, Romania, Romania
Subcategory
Application Type
Client Metro Bucharest
Contractor company Astaldi

Product used for the project

MAPEBENT CBS4
MAPEBENT CBS4
Sodic bentonite for civil engineering
MAPEBLOX PKG
MAPEBLOX PKG
Packing grease for mechanized tunnelling with TBM
MAPEBLOX T
MAPEBLOX T
MAPEBLOX T
MAPEQUICK CBS SYSTEM 1
MAPEQUICK CBS SYSTEM 1
Liquid retarding admixture with plasticizing effect for cementitious-based…
MAPEQUICK CBS SYSTEM 2
MAPEQUICK CBS SYSTEM 2
Liquid activator admixture used in extremely fluid backfill grouts systems,…
POLYFOAMER FP/CC
POLYFOAMER FP/CC
High performance liquid foaming agent, based on biodegradable anionic…