Metro Line 2 in Prague

Location icon Praha, ÄŒeská republika, Czech Republic
Two EPB-TBM by Herrenknecht excavated the 4.5 km long second metro line in Prague through sands and clays.
The products for ground conditioning MAPEQUICK CBS SYSTEM1 and MAPEQUICK CBS SYSTEM2 were supplied.
Ref #: 0
Category:

Construction

Location Praha, ÄŒeská republika, Czech Republic
Subcategory
Built in 2011
Opened in 2014
Application Type
Contractor company Metrostav

Product used for the project

MAPEQUICK CBS SYSTEM 1
MAPEQUICK CBS SYSTEM 1
Liquid retarding admixture with plasticizing effect for cementitious-based…
MAPEQUICK CBS SYSTEM 2
MAPEQUICK CBS SYSTEM 2
Liquid activator admixture used in extremely fluid backfill grouts systems,…