Two TBM - EPB manufactured by Herrenknecht are currently excavating the Metro Line 5 that constitutes phase IV of the Bucharest metro modernization project. The Section 2 of the line n.5 will be 8.7 km-long. Two parallel tunnels each of 5.7 m-diameter and 4.85 km-long are under construction.
Ref #: 0
Category:
Construction
Location
Bucharest, Romania, Romania
Subcategory
Application Type
Client
Metrorex
Contractor company
Astaldi (Italy) - Fomento de Construcciones y Contratas (Spain) - AB Construct (Romania)