Metro Line n.5 in Bucharest - Romania

Location icon Bucharest, Romania, Romania
Two TBM - EPB manufactured by Herrenknecht are currently excavating the Metro Line 5 that constitutes phase IV of the Bucharest metro modernization project.
The Section 2 of the line n.5 will be 8.7 km-long.
Two parallel tunnels each of 5.7 m-diameter and 4.85 km-long are under construction.
Ref #: 0
Category:

Construction

Location Bucharest, Romania, Romania
Subcategory
Application Type
Client Metrorex
Contractor company Astaldi (Italy) - Fomento de Construcciones y Contratas (Spain) - AB Construct (Romania)
Other SPECIAL WATERPROOFING FOUNDATION WORK

Product used for the project

EPOJET LV
EPOJET LV
Two-component epoxy resins, with very low viscosity for injection in…
MAPEBENT CBS 2
MAPEBENT CBS 2
Bentonite for use in all engineering application
MAPEBENT CBS 4
MAPEBENT CBS 4
Sodic bentonite for civil engineering
MAPEQUICK CBS SYSTEM 1
MAPEQUICK CBS SYSTEM 1
Liquid retarding admixture with plasticizing effect for cementitious-based…
MAPEQUICK CBS SYSTEM 2
MAPEQUICK CBS SYSTEM 2
MAPEQUICK CBS SYSTEM 2
POLYFOAMER FP/CC
POLYFOAMER FP/CC
High performance liquid foaming agent, based on biodegradable anionic…
POLYFOAMER FP-L
POLYFOAMER FP-L
Liquid foaming agent based in combination with a lubricating polymer for ground…
RESFOAM 1K-M
RESFOAM 1K-M
One-component, ultra-fluid polyurethane resin applied by injection for…
Product not found