Metro Line n.5 in Bucharest - Romania

Location icon Bucharest, Romania, Romania
Two TBM - EPB manufactured by Herrenknecht are currently excavating the Metro Line 5 that constitutes phase IV of the Bucharest metro modernization project.
The Section 2 of the line n.5 will be 8.7 km-long.
Two parallel tunnels each of 5.7 m-diameter and 4.85 km-long are under construction.
Ref #: 0
Category:

Construction

Location Bucharest, Romania, Romania
Subcategory
Application Type
Client Metrorex
Contractor company Astaldi (Italy) - Fomento de Construcciones y Contratas (Spain) - AB Construct (Romania)
Other SPECIAL WATERPROOFING FOUNDATION WORK

Product used for the project

EPOJET LV
EPOJET LV
Two-component epoxy resins, with very low viscosity for injection in…
MAPEBENT CBS2
MAPEBENT CBS2
Bentonite for use in all engineering application
MAPEBENT CBS4
MAPEBENT CBS4
Sodic bentonite for civil engineering
POLYFOAMER FP/CC
POLYFOAMER FP/CC
High performance liquid foaming agent, based on biodegradable anionic…
POLYFOAMER FP-L
POLYFOAMER FP-L
Liquid foaming agent combined with a lubricating polymer for ground conditioning
RESFOAM 1KM
RESFOAM 1KM
One-component, ultra-fluid polyurethane resin applied by injection for…
2323 - MAPEJET SYSTEM C40
MAPEJET SYSTEM C40
Product not available for this market,
contact us
2274 - MAPEQUICK CBS SYSTEM 1
MAPEQUICK CBS SYSTEM 1
Product not available for this market,
contact us
2275 - MAPEQUICK CBS SYSTEM 2
MAPEQUICK CBS SYSTEM 2
Product not available for this market,
contact us