Mui Trau Tunnel Project

Location icon Danang, Vietnam, Vietnam
1.280m length and 10.5m diameter including 2 parallel single tunnels, the tunnels were excavated by New Austria Tunneling Method (NATM).
Ref #: 0
Category:

Construction

Location Danang, Vietnam, Vietnam
Subcategory
Built in 2015
Opened in 2017
Application Type
Client Songda Enterprise 10.5 and Son Hai Construction Co., Ltd
Contractor company Songda Enterprise 10.5 and Son Hai Construction Co., Ltd

Product used for the project

EXPANFLUID
EXPANFLUID
Expansive anti-shrinkage agent for slurries for injection.
MAPEQUICK AFK 888
MAPEQUICK AFK 888
Alkali-free accelerator for shotcrete Where to use • Securing surfaces during…