Nishimatsu Contract 929 A Down Town Line 3
Singapore, Singapore
Excavation with 4 EPB of 6.61 meters diameter from Herreknecht at Singapore, Down Town Line 3.
Construction
|
|
| Location |
Singapore, Singapore
|
| Subcategory |
|
| Built in |
2013
|
| Opened in |
2013
|
| Application Type |
|
| Client |
LTA
|
| Contractor company |
Nishimatsu Construction Company
|
Browse the project Gallery
Exception occured while executing the controller. Check error logs for details.