Riyadh Metro - Orange Line

Location icon Riyad, Al-Riyad, Arabia Saudita, Saudi Arabia
The Orange Line (Line 3) involves the excavation of 4.5 Km of tunnel that is part of the 41.58 km, starting from the west (near the Jeddah Expressway) and ending in the east (near the National Guard Camp of Khashm El Aam) for a total of 22 built stations divided into 4 different types.
excavation: 1 x EPB TBM NFM, diameter 10 m
Ref #: 0
Category:

Construction

Location Riyad, Al-Riyad, Arabia Saudita, Saudi Arabia
Subcategory
Built in 2015
Opened in 2017
Application Type
Contractor company Salini – Impregilo Saudi Branch (Arriyadh New Mobility)

Product used for the project

MAPEBLOX H
MAPEBLOX H
MAPEBLOX H
MAPEBLOX T S
MAPEBLOX T S
Tail sealant for mechanized tunneling with TBM Product sold only by Mapei…
MAPEGEL UTT SYSTEM
MAPEGEL UTT SYSTEM
Three-component flexible hydrophilic gel for waterproofing injection in…
MAPEGROUT GUNITE 300 AF
MAPEGROUT GUNITE 300 AF
Pre-packed one-component cementitious mortar with accelerated setting for dry…
MAPEPLAN TU S
MAPEPLAN TU S
Synthetic waterproofing membrane Where to use • Drill and blast tunnel…
MAPEQUICK CBS SYSTEM 1
MAPEQUICK CBS SYSTEM 1
Liquid retarding admixture with plasticizing effect for cementitious-based…
MAPEQUICK CBS SYSTEM 2
MAPEQUICK CBS SYSTEM 2
Liquid activator admixture used in extremely fluid backfill grouts systems,…
MICROCEM 8000
MICROCEM 8000
Micro-fine hydraulic binder with pozzolanic action for ground consolidation and…
POLYFOAMER FP
POLYFOAMER FP
High performance liquid foaming agent, based on biodegradable anionic…
RESFOAM 1KM
RESFOAM 1KM
One-component, ultra-fluid polyurethane resin applied by injection for…
2092 - IDROSTOP PVC BI BE
IDROSTOP PVC BI BE
Product not available for this market,
contact us
369 - PLANIGROUT 300
PLANIGROUT 300
Product not available for this market,
contact us