Seehoftunnel
Achenkirch, Tyrol, Austria, Austria
The length of the two line road tunnel is about 500 m
repair works were carried out in 2014, July-August
products used: IDROSILEX PRONTO RPG, IDROSILEX PRONTO RPF
Construction
|
|
| Location |
Achenkirch, Tyrol, Austria, Austria
|
| Subcategory |
|
| Built in |
2014
|
| Opened in |
2014
|
| Application Type |
|
| Other |
concrete repair works
|