Seehoftunnel
Achenkirch, Tyrol, Austria, Austria
The length of the two line road tunnel is about 500 m
repair works were carried out in 2014, July-August
products used: IDROSILEX PRONTO RPG, IDROSILEX PRONTO RPF
Construction
|
|
Location |
Achenkirch, Tyrol, Austria, Austria
|
Subcategory |
|
Built in |
2014
|
Opened in |
2014
|
Application Type |
|
Other |
concrete repair works
|