Khor Fakkan- Shis Road and Tunnel Project

Location icon United Arab Emirates
Ref #: 0
Category:

Construction

Location United Arab Emirates
Subcategory
Start and finish date 2017
Application Type
Contractor company Gulf Rock

Product used for the project

ADESILEX PG2
ADESILEX PG2
Two-component thixotropic epoxy adhesives for structural bonding
LAMPOSILEX
LAMPOSILEX
Ultra quick-setting and hardening hydraulic binder for blocking seeping water.
MAPEGEL UTT SYSTEM
MAPEGEL UTT SYSTEM
Three-component flexible hydrophilic gel for waterproofing injection in…
MAPEPLAN TU S
MAPEPLAN TU S
Synthetic waterproofing membrane Where to use • Drill and blast tunnel…
MAPEQUICK AF 70
MAPEQUICK AF 70
Alkali-free accelerator for sprayed concrete
STABILCEM T
STABILCEM T
Product not available for this market,
contact us