The project comprises a main tunnel (4 050 m; 133 m2) and two emergency tunnels (911 m 25 m2; 700 m 53 m2). products used: MAPEQUICK AF2000, MAPEQUICK AF118, ZINKBOLT, GROUT TECH 2000, DYNAMON SX-N, MAPECURE CCI2000, REDIREP 45
Alkali-free accelerator for shotcrete Where to use • Securing surfaces during tunnelling. • Inner lining even in presence of very squeezing soils. • Shotcrete for structural tunnel repairs. •…
Alkali-free accelerator for shotcrete Where to use • Securing surfaces during…