On highway tunnel along the A1 Milano – Napoli. The tunnel belongs to the great project “Variante di Valico”, with the goal to improve the communication between Bologna and Firenze along the Appennini area. Underground Length: 5.5 km approx., excavated with 1 TBM-EPB.- At the moment of the excavation, the TBM was the biggest one in the whole world, with a excavation diameter of 15.62 m. The two-component back fill grout system is being injected through the precast concrete rings and the formation.
Ref #: 0
Category:
Construction
Location
Sparvo, BO, Italia, Italy
Subcategory
Built in
2013
Opened in
2013
Application Type
Client
Autostrade per l'Italia
Contractor company
SAN BENEDETTO VAL DI SAMBRO (Toto, Vianini, Profacta)
One-component, ultra-fluid polyurethane resin applied by injection for waterproofing structures and ground and rocks subject to intense percolating water. The reaction time may be regulated.
One-component, ultra-fluid polyurethane resin applied by injection for…