On highway tunnel along the A1 Milano – Napoli. The tunnel belongs to the great project “Variante di Valico”, with the goal to improve the communication between Bologna and Firenze along the Appennini area. Underground Length: 5.5 km approx., excavated with 1 TBM-EPB.- At the moment of the excavation, the TBM was the biggest one in the whole world, with a excavation diameter of 15.62 m. The two-component back fill grout system is being injected through the precast concrete rings and the formation.
Ref #: 0
Category:
Construction
Location
Sparvo, BO, Italia, Italy
Subcategory
Built in
2013
Opened in
2013
Application Type
Client
Autostrade per l'Italia
Contractor company
SAN BENEDETTO VAL DI SAMBRO (Toto, Vianini, Profacta)
Liquid activator admixture used in extremely fluid backfill grouts systems, even with thigh water content, to be used in mechanized tunnelling with TBM
Liquid activator admixture used in extremely fluid backfill grouts systems,…
One-component, ultra-fluid polyurethane resin applied by injection for waterproofing structures and ground and rocks subject to intense percolating water. The reaction time may be regulated.
One-component, ultra-fluid polyurethane resin applied by injection for…