STEP Project - CONTRACT LS – 01/02
Abu Dhabi, United Arab Emirates
The sewers were constructed using pipe jacking method, total length 50 Km
In the project there were also the construction of 340 shafts.
Ref #:
0
Category:
Construction
Location
Abu Dhabi, United Arab Emirates
Subcategory
Built in
2009
Opened in
2013
Application Type
Client
Abu Dhabi Sewerage Services Company (ADSSC)
Contractor company
Zublin
Product used
for the project
MAPEGROUT GUNITE 300 AF
Pre-packed one-component cementitious mortar with accelerated setting for dry mix shotcrete
Pre-packed one-component cementitious mortar with accelerated setting for dry…
MAPEQUICK AFK 888
Alkali-free accelerator for shotcrete
Alkali-free accelerator for shotcrete