Toggle navigation
About & Services
Products
Projects
Downloads
News
Contact us
Back
Tabriz Metro line 1
Tabriz, Regione dell'Azarbaijan orientale, Iran, Iran
The 2 TBM of Alamoot Bridge & Building Engineering completed 2 tunnel of 17 Km.
Ref #:
0
Category:
Construction
Location
Tabriz, Regione dell'Azarbaijan orientale, Iran, Iran
Subcategory
Built in
2015
Opened in
2016
Application Type
Contractor company
Alamoot Bridge & Building Engineering
Other
mechanized tunnelling: underground TBM works
Browse the
project Gallery
Product used
for the project
MAPEBLOX H
MAPEBLOX H
MAPEBLOX H
POLYFOAMER FP/LL
Liquid foaming agent based on biodegradable anionic surfactants combined with a lubricating polymer for ground conditioning
Liquid foaming agent based on biodegradable anionic surfactants combined with a…