The Thomson-East Coast Line (TEL) will be the sixth Mass Rapid Transit (MRT) and the fourth fully automated and driverless system line in Singapore. The line, which is 43 km (27 mi) long and consists of 31 stations, will run through the north-south corridor. 3 slurry NFM are excavating for a total length of 4500m advancing at a rate of 6350mm/d. MAPECOAT W SP is the product selected for the final coating of the project.