The Thomson-East Coast Line (TEL) will be the sixth Mass Rapid Transit (MRT) and the fourth fully automated and driverless system line in Singapore. The line, which is 43 km (27 mi) long and consists of 31 stations, will run through the north-south corridor. Contract T209 refers to the design and construction of Lentor Station& tunnels. 2 slurry CREG excavating the tunnel length of3000m at a rate of 6350mm/d. For the final coating of the project MAPECOAT W SP is the product selected being a leader of the Sector.