Thomson East Coast Line - T215
Singapore, Singapore
The Thomson-East Coast Line (TEL) will be the sixth Mass Rapid Transit (MRT) and the fourth fully automated and driverless system line in Singapore.
The line, which is 43 km (27 mi) long and consists of 31 stations, will run through the north-south corridor.
The contract is for the construction of Mount Pleasant station and tunnels.
2 slurry Kawasaki are excavating the tunnel (4000m) at a speed of 6350mm/d.
UTT Mapei supplied MAPEBENT API for the ground conditioning.
Final coating is performed by MAPECOAT W SP, world leader of the Sector.
Construction
|
|
Location |
Singapore, Singapore
|
Subcategory |
|
Built in |
2016
|
Application Type |
|
Client |
LTA
|
Contractor company |
RSEA/Eng Lee/Wai Fong JV
|