Thomson East Coast Line - T219
Singapore, Singapore
The Thomson-East Coast Line (TEL) will be the sixth Mass Rapid Transit (MRT) and the fourth fully automated and driverless system line in Singapore.
The line, which is 43 km (27 mi) long and consists of 31 stations, will run through the north-south corridor.
The contract refers to the construction of Orchard Station and tunnels.
1 slurry Herrenknecht will excavate the total tunnel length of 1700m at a speed rate of 6350mm/d.
As for almost all the project of Downtown Line in Singapore, also for Thomson East Coast Line the final coating is performed by MAPECOAT W SP, UTT Mapei product leader in the sector.
Construction
|
|
Location |
Singapore, Singapore
|
Subcategory |
|
Built in |
2016
|
Application Type |
|
Client |
LTA
|
Contractor company |
Penta Ocean & Bachy JV
|
Browse the project Gallery
Exception occured while executing the controller. Check error logs for details.