Thomson East Coast Line- T 225

Location icon Singapore, Singapore
Contract for the construction of Shenton Way Station. tunnel length: 1280m
Ref #: 0
Category:

Construction

Location Singapore, Singapore
Subcategory
Built in 2016
Application Type
Client LTA
Contractor company STEC (China)

Product used for the project

MAPEBLOX T
MAPEBLOX T
MAPEBLOX T
POLYFOAMER FP
POLYFOAMER FP
High performance liquid foaming agent, based on biodegradable anionic…
RESFOAM 1KM
RESFOAM 1KM
One-component, ultra-fluid polyurethane resin applied by injection for…
2226 - MAPEBLOX PKG
MAPEBLOX PKG
Product not available for this market,
contact us