Thomson East Coast Line- T 225

Location icon Singapore, Singapore
Contract for the construction of Shenton Way Station. tunnel length: 1280m
Ref #: 0
Category:

Construction

Location Singapore, Singapore
Subcategory
Built in 2016
Application Type
Client LTA
Contractor company STEC (China)

Product used for the project

MAPEBLOX PKG
MAPEBLOX PKG
Packing grease for mechanized tunnelling with TBM
MAPEBLOX T
MAPEBLOX T
MAPEBLOX T
POLYFOAMER FP
POLYFOAMER FP
High performance liquid foaming agent, based on biodegradable anionic…
RESFOAM 1KM
RESFOAM 1KM
One-component, ultra-fluid polyurethane resin applied by injection for…