Transcity Legacy Way Tunnel

Location icon Brisbane, Queensland, Australia, Australia
The Legacy Way project in Brisbane has been completed and represents an innovative project in the mechanized tunnelling field. Two Hard Rock-TBMs, manufactured by Herrenknecht were used and excavated approx. 4,6 km of tunnels. This are the first two TBM all over the world that are using the two-component bakfill grouting system.
Ref #: 0
Category:

Construction

Location Brisbane, Queensland, Australia, Australia
Subcategory
Built in 2012
Opened in 2014
Application Type
Contractor company GHELLA S.p.A (Italy), Acciona (Spain) and BMD (Austrialian)

Product used for the project

MAPELASTIC TU SYSTEM
MAPELASTIC TU SYSTEM
One-component ready to use polymeric sprayable membrane for tunnels and…
MAPEQUICK CBS SYSTEM 1
MAPEQUICK CBS SYSTEM 1
Liquid retarding admixture with plasticizing effect for cementitious-based…
MAPEQUICK CBS SYSTEM 3
MAPEQUICK CBS SYSTEM 3
Accelerator for cement-based grouts