Tullnerfeld, Gemeinde Langenrohr, Austria, Austria
A new railway track was built to reduce the running time between the cities Vienna and St. Pölten. 3 unit sections: Tunnel: Saladorf L = 663 m; Hankenfeld L = 729 m; Atzenbrugg L =2.490 m were constructed in an open cut tunneling construction. The concrete was made according to the guideline for waterproofing concrete structures - 'Weiße Wanne', that means without an additional sealing. The concrete was cooled to the temperature of 22 °C during hardening. Mapei UTT provided products from the lines DYNAMON, MAPEPLAST and MAPETARD
Ref #: 0
Category:
Construction
Location
Tullnerfeld, Gemeinde Langenrohr, Austria, Austria