The M6 motorway is a north-south section of the Trans European Network corridor following the left bank of the Danube river, and connecting Hungary´ s capital Budapest with the Croatian Border. The construction volume of the entire project amounted to € 855 million. The Tunnel project consists of 8 tunnels built with NATM (new Austrian Tunnelling Method) mined tunnels with a total length of 6 km, named Tunnel “A”, “B”, “C” and “D”. The Underground Technology Team Austria supported the job site from beginning to the end especially for shotcrete accelerator and repair products.
Ultra rapid setting two-component polyurethane resin with fluid consistency, to be injected for consolidating and waterproofing of structures subject to weal water ingress Where to use –…
Ultra rapid setting two-component polyurethane resin with fluid consistency, to…
MAPEGROUT THIXOTROPIC ZERO is used for repairing horizontal and vertical surfaces on degraded concrete structures ; may be applied in thick layers without using formwork. It is a pre-blended mortar…
MAPEGROUT THIXOTROPIC ZERO is used for repairing horizontal and vertical…