Warsaw Metro Line 2

Location icon Warszawa, Polska, Poland
Four EPB-TBM by Herrenknecht have excavated the second metro line in Warsaw
Ref #: 0
Category:

Construction

Location Warszawa, Polska, Poland
Subcategory
Built in 2011
Opened in 2014
Application Type
Client Metro Warsawa
Contractor company AGP Metro (Astaldi-Gulermark-PBDIM)

Product used for the project

MAPEBENT CBS4
MAPEBENT CBS4
Sodic bentonite for civil engineering
MAPEBLOX T
MAPEBLOX T
MAPEBLOX T
MAPEDRILL M1
MAPEDRILL M1
Synthetic polymer in liquid form for water based fluids to be employed in…
MAPEPLAN TU S
MAPEPLAN TU S
Synthetic waterproofing membrane Where to use • Drill and blast tunnel…
POLYFOAMER FP/CC
POLYFOAMER FP/CC
High performance liquid foaming agent, based on biodegradable anionic…
RESFOAM 1KM
RESFOAM 1KM
One-component, ultra-fluid polyurethane resin applied by injection for…
2226 - MAPEBLOX PKG
MAPEBLOX PKG
Product not available for this market,
contact us
305 - MAPEFILL
MAPEFILL
Product not available for this market,
contact us
2079 - MAPEPLAN TT
MAPEPLAN TT
Product not available for this market,
contact us
2274 - MAPEQUICK CBS SYSTEM 1
MAPEQUICK CBS SYSTEM 1
Product not available for this market,
contact us
2288 - MAPEQUICK CBS SYSTEM 3
MAPEQUICK CBS SYSTEM 3
Product not available for this market,
contact us