| Location | Germany |
|---|---|
| Subcategory | |
| Application | Renewal of a 135 year old and 367 meter long railway tunnel on the Mosel line near Neef. First tunnel renewal in Germany under ongoing rail traffic with electric overhead line. So-called "tunnel in tunnel method" |
| Start and finish date | 2019 |
| Application Type | |
| Client | DB Netz AG Regionalbereich Mitte |
| Contractor company | ARGE Tunnel Petersberg c/o MARTI GmbH Deutschland |