| Yard | Renewal or modernization of a 153 year old and 138 meter long double track railway tunnel including the portals and supporting structures in Wittighausen. Drill and blast excavation method with shotcrete application. |
|---|---|
| Location | Germany |
| Subcategory | |
| Application | Renewal or modernization of a 153 year old and 138 meter long double track railway tunnel including the portals and supporting structures in Wittighausen. Drill and blast excavation method with shotcrete application. |
| Start and finish date | 2019 |
| Application Type | |
| Client | DB Netz AG Frankfurt |
| Contractor company | ARGE Tunnel Wittighausen |