Location | Germany |
---|---|
Subcategory | |
Application | 2 tubes road tunnel by B 31 with two lanes each direction by length with 700 m. Both tunnels was excavated by cut and cover. |
Start and finish date | 2017 |
Application Type | |
Client | Deges |
Contractor company | Baresel Tunnelbau GmbH |