| Location | Germany |
|---|---|
| Subcategory | |
| Application | 2 tubes road tunnel by B 31 with two lanes each direction by length with 700 m. Both tunnels was excavated by cut and cover. |
| Start and finish date | 2017 |
| Application Type | |
| Client | Deges |
| Contractor company | Baresel Tunnelbau GmbH |