Uma Oya Multipurpose Development Project

Location icon Sri Lanka, Sri Lanka
The Uma Oya Multi-Purpose Development Project (UOMDP) consists of the construction of two dams across two main tributaries of Uma Oya at Welimada and Dyraba and in a 23km long trans-basin diversion tunnels with an underground power station at Randeniya. The objectives are the generation of hydropower, irrigation, provision of drinking water and of water for industrial activities. In particular, the major concern is to provide water for the second International Airport in Hambanthota, the Industrial Zone of Hambanthota, the Hambanthota Harbour and the Oil Refinery.
The project consisted in the excavation with hard rock doubleshield Herrenknecht of a 12km tunnel
Ref #: 0
Category:

Construction

Location Sri Lanka, Sri Lanka
Subcategory
Built in 2011
Opened in 2015
Application Type
Client State Works
Contractor company Farab (Iran)
Other mechanized tunnelling: underground TBM works

Product used for the project

MAPEDRILL F.R.A. 01
MAPEDRILL F.R.A. 01
Anti-abrasive agent for mechanized tunnelling Where to use Mapedrill F.R.A. 01…