The Matinkylä–Kivenlahti stretch of the west metro will be the next construction phase consisting of 7 kilometres metro tunnels with 5 metro stations and maintence/service tunnal. New stations will be Finnoo, Kaitaa, Soukka, Espoonlahti, and Kivenlahti. The project will be completed in 2020 at the earliest.
Ref #: 0
Category:
Construction
Location
Matinkylä, Espoo, Finlandia, Finland
Subcategory
Built in
2014
Opened in
2020
Application Type
Contractor company
Destia Oy, Kalliorakennus Oy, Lujitustekniikka Oy, Figere Oy, Lemminkäinen
Alkali-free accelerator for shotcrete Where to use • Securing surfaces during tunnelling. • Inner lining even in presence of very squeezing soils. • Shotcrete for structural tunnel repairs. •…
Alkali-free accelerator for shotcrete Where to use • Securing surfaces during…
Pumping aid admixture for concretes Where to use Mapestart 1 has to be mixed with water. Add 20-35 l of water for each bag (nearly 225 g) of Mapestart 1. The quantity of Mapestart 1, i.e. the number…
Pumping aid admixture for concretes Where to use Mapestart 1 has to be mixed…
One-component, ultra-fluid polyurethane resin applied by injection for waterproofing structures and ground and rocks subject to intense percolating water. The reaction time may be regulated.
One-component, ultra-fluid polyurethane resin applied by injection for…